PD013 - Ras Al Khor Crossing |
![]() |
Description of WorkProject Code: PD013Project No: Project R800/3A The project comprises of 11 Bridges grouped into 2 major groups of interchanges which connect the new Ras Al Khor Main Road to the existing Oud Metha and 2nd Za’abeel Roads. The Oud Bridges also cross over the new Business Bay Canal. Nearly 5km of the new 5-lane dual carriageway Ras Al Khor Main Road will be constructed, extending from the new Fourth Creek Crossing to the limit of work with Contract R800/3B at Za’abeel area. Associated road works, consisting of a multitude of access roads, ramps and slipways, complement the system of interchanges. The works also oversee the widening and improvement to the existing Oud Metha and 2nd Za’abeel Roads. The Project also involves extensive relocation of utility services away from the Project area and into specified reservations. A 40m wide, 842 m long dual carriageway underpass (EP-2D) was added to the scope of the Project in June 2007, comprising about 26% of the original contract value. Project Details
Site LocationThe R800/3A Project is part of the overall fourth creek crossing schemed designated as the “R800/3A – Ras Al Khor Crossing Corridor”.click image to enlarge Contact InformationSamer ReyadSr. Project Manager ![]() ![]() CONSULTANT Parsons De Leuw Cather ![]() ![]() |